Aug 18
We will be moving our server from BlueSquare rack to a new facility on 19/08/2009.
The move will occur during a window from 22:00 on 19/08/2009 and 05:00 on 20/08/2009.
The server will be powered down, packaged and transported to the new facility.
At the new site it will be re-racked into a pre-prepared environment and checks made by our technicians that connectivity is restored.
- Server: alpha
- Date: 19/08/2009.
- Window: 22:00 for 7 hours
- Duration: < 2 hours
We apologise if this maintenance period causes disruption and will do all we can to minimise it.
Thank you.
Regards,
AR Hosting Solutions.
20th August, 2009 at 09:33 AM BST
The server was moved successfully within the time frame.